My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 8:05:19 PM
Creation date
1/10/2025 11:21:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0508452
PE
2361 - UST FACILITY
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TnknIy <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#.7-Eleven#41341 41341 Date.6/13/2025 <br /> Address:4405 Pacific Ave Name:Carlos Zaragoza <br /> City/State:Stockton CA <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines, and <br /> dispensers)are de-energized, and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram l: f <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS C' <br /> 5 Do all E-Stops shutdown power to ALL STP's <br /> 6 Are ALL E-Stops clearly Labeled C+ <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. <br /> 9 All safety barricades and test equipment has been properly removed C+ <br /> 10 E-Stop was reset and all dispensing functions are normal <br /> E-Stop Inspection Results <br /> 11 PASS FAIL INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2384428 <br />
The URL can be used to link to this page
Your browser does not support the video tag.