My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 8:05:19 PM
Creation date
1/10/2025 11:21:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0508452
PE
2361 - UST FACILITY
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PAOCEDURE ONLY, FOR STANDARD M00- STEP 3T: DETERIMINE CABLE LENGTH <br /> EM PROCEED TO NEXT VAGL run cable along upper tube antd aver the Rap place on <br /> the flit bradwz as shown. With the float in dw down <br /> STEP I1= JNSTALL SO[ii U ADAPTOR ASST pa on(as shown in Figure 3T)align ivop in cable Mth <br /> Put cable thrrl threads in inlet tube and out thru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side c f inlet tube. Th Fe0d The socket adaptor templaw to s] t he loop in the cable and pail cable <br /> assern ly finger tight into the in let tube. Note. the ca- tight and crimp fertr.11e W tl, crimpl N tool!pliers onto <br /> ble port on the inlet tube must be in Ilrre with the ftat cable at this location. Trim excess ca bile with wire cu t- <br /> as shown pa vIously in Figure 8A- ter 1 scissor, for reference,from tl@ sew where the <br /> upper tube and valve body meet to the end of the table <br /> Socket after trimming wvilI mquire apprmirnwely 130 of<able. <br /> adaptor <br /> Cable over float bra[itet <br /> - - - Cable m <br /> See <br /> I+{I pow <br /> i Flgum 3T <br /> STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br /> F*um IT Ensure Cable Is over the Bloat bracket+ U"the sup- <br /> plied rivet align loop in cable with tap hole in float <br /> STVP 2Tj PASS CABLE THRU l`lERR(JLE bracket and pass rivet thru cable loop and float bracket <br /> Pass cable thru ferrule. Loop cable and then pass cable hole. Using r M too)for Ilir dia rnarldrel attar-h rivet <br /> back Thru ferrul-. Keep ferrule loose until cable length and cable W the float btw kec See lass page for list of <br /> is detwml ned in the next seep. Note: M cable eyed frays replacement cable parts, <br /> it may bo necessary to trim the cable aga In to pass thru <br /> ferrule. - �..� At ach rivet to top hole <br /> 1 W mandrel <br /> aver i � f•.��!`'� <br /> Fe rrUie <br /> Tdrn STIEP ST.ENSURE PROPER CADU OPERATION <br /> csdle Unt hmad the sodwr adarpeor assembly from the inlet <br /> afifr �_ tube and ensure Boat dr►d <br /> poppet em3re frly when <br /> strp r Look _ .orke!T adapwr assembler is pulled ouw. it should only <br /> req u ire 3`to 4`uA nxYvement Fn order to actuate the <br /> Fhgum2l float and poppet. Thread socket adapkw assembly fin- <br /> ger tight Mtn in let tLp he after teong- <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.