Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer ❑fT Industry Standard El Professional Engineer <br /> Test Type © Pressure 0 Vacuum Hydrostatic <br /> Test Equipment Used: incon Level 4 <br /> Sump/UDC ID 91 sTP <br /> Sump Manufacturer Western (FRP) <br /> Sump Depth (inches) 64 <br /> Sump Bottom to Top of 26 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:01 <br /> Initial Reading 6.2744 <br /> Test End Time 10:17 <br /> Final Reading 6.2742 <br /> Change in Reading -0.0002 <br /> Pass/Fail Criteria +/-0.0020 <br /> Tightness Test Results El Pass rl Fail El Pass 0 Fail [rj Pass 0 Fail [Cl Pass ❑l Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results R7 Pass 0 Fail 0 Pass El Fail 0 Pass © Fail C Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />