Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> USTMon.tcr.ng Site Plan <br /> --------------------r-----------------------------------------------------------------------------------------------------------------------------r <br /> S to Address WILSON WAY CHEVRON 437 WILSON WAY STOCKTON CA 95205� <br /> . . . . . . . . . . . . . . . . . . . . . <br /> TLS <br /> STORE <br /> . . . . . . . . . . F <br /> R <br /> . . . . . . . . . . . . . E <br /> M <br /> O <br /> *PIP G; <br /> Dranine of piping . . . . . . . . . . . . . . . . . . . . . . N <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . T <br /> LDC's.No . . . . . . . . . . . . . . . . . . . . . <br /> underSound <br /> wag* <br /> isO [[ . . . . . . . . . . S <br /> assaa�z>�.n,e T <br /> ,annot speculate . . . . 91. <br /> b:ue prints. P R <br /> O ` E <br /> a E <br /> P <br /> O O _ T <br /> kay . . . . . <br /> 0 <br /> .1=.AN-N 131—AR . . . . . . . . . . . . T <br /> F=FILLS . <br /> T=TL°RBL`IE . . . . . . . <br /> P=PROBE T X <br /> V=VAPOR . . . . . . <br /> X=SUNIP SENSOR . . . . . X <br /> L=Leak Detector <br /> NI=Mien ap I . . . . . . . <br /> B=Brine Sensor <br /> I=Smart Sensor . . . . . . . <br /> S=STP <br /> C=Floats&Chaias <br /> E=E Stop <br /> NNUSON WAY <br /> Oki item;underground that are not v able to the certj6ing technician are a <br /> profs sionai opinion on&and are:aleh•for blformational purpose:. Drmving <br /> not to scale <br /> Date map was drawn: 2/12119 <br /> Instructions <br /> If you already have a diagram that shows all required information.you may include it rather than this page,with your Monitoring System Certification. On your stie plan. <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas:mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detecton�. In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />