Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> S. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (ore OPE per column) e7-a 87-B 91 nSL <br /> Are both vent and tank riser piping �/ Yes �/ Yes Yes �/ Yes <br /> secondarily contained? No No No No <br /> OPE Model OPW 71SO DPW 71SO OPW 71SO OPW 71SO <br /> What is the OPE response when activated? 21 Shut off ZI Shut off Y/ Shut off ti/ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> Restricts Restricts 7Restricts Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes' Yes* Yes* Yes* <br /> that may interfere with the OPE operation? f No No No �/ No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 103.375" 103.75" 102.625" 103.125" <br /> What is the percent capacity of the tank at <br /> 92% 92% 92$ 92% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to Y/ Yes Yes �/ Yes r/ Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results f Pass E <br /> Pass ,/ Pass Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank charts), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />