My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:13:24 PM
Creation date
1/14/2025 10:41:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0524617
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4219 E MORADA LN STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stadon es Compliance Dept. <br /> 680 Quinn Ave <br /> San Jose, CA 95112 <br /> Inc. 408-213-6039 -Office <br /> 408-213-6026-Fax <br /> October 31, 2024 <br /> To: San Joaquin County EHD <br /> Fr: Christina Tran, Service Station Systems/Able Maintenance, Inc. <br /> Re: Ratey's; 4219 Morada Lane,.Stockton <br /> I am enclosing the permit application, and other documentation for the following repair. <br /> Scope of Work: <br /> • Arrive on site <br /> • Check in with site <br /> • LOTO <br /> • Drain diesel product line <br /> • Remove dispenser from island and make safe on a pallet <br /> • Remove this section of pipe from the smith bulkhead fitting in a manor not to damage the <br /> penetration fitting <br /> • Sand as needed to preserve entry fitting and remove pipe 4;`W Caf�'4 be preSeVve'CA, 1�" <br /> • Send pictures to Dana E'�Lce'4 . <br /> • Dry fit new piece of pipe <br /> • Final sand and acetone <br /> • Glue <br /> • Allow time to cure time <br /> • Test <br /> • Permit inspections <br /> • Put the dispenser back on island <br /> • Test line <br /> • Leave site <br /> If you need any additional information or have any questions, please call me. Also, please send a copy of <br /> the permit to me at the address below. <br /> Thank you for your help in this matter. Your very prompt consideration of this matter is always greatly <br /> appreciated. <br /> Sincerel <br /> �C ristina Tran <br /> Project and Permit Coordinator <br /> Service Station Systems <br /> 680 Quinn Ave, San Jose, CA 95112 <br /> Ph: (408) 213-6039 <br /> christinatrr servicestationsystems.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.