My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:13:24 PM
Creation date
1/14/2025 10:41:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0524617
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4219 E MORADA LN STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> 87 91 DIESEL <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r Yes Yes Yes Yes <br /> secondarily contained? r No r No r No No <br /> OPE Model Franklin/EBW Franklin/EBW Franklin/EBW <br /> W Shut off W Shut off W Shut off F Shut off <br /> Flow Flow Flow Flow <br /> F Restricts F Restricts r Restricts r Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) r Audible r Audible F Audible F Audible <br /> Alarm Alarm Alarm Alarm <br /> F Visual F Visual F Visual F Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? G No No No No <br /> At what level in the tank is the OPE set to 100.875 99.625 101.875 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 91.9 91.4 91.7 <br /> Is the OPE in proper operating condition to G. Yes Yes Yes Yes <br /> respond when the stored substance reaches r No r No No No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> G. Pass a Pass a Pass Pass <br /> OPE Inspection Results r Fail r Fail r' Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> F Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.