Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Map <br /> Site Address: EAST&EASY#60-10878 N 99 STOCKTON <br /> STORE <br /> 87 <br /> VR <br /> TLS 350 X <br /> F V A <br /> (DO <br /> t l\..`.Jl <br /> 91 DSL <br /> 2 4 <br /> 5 7 <br /> 6 8 <br /> 99 FRONTAGE ROAD <br /> KEY <br /> *PIPING^ A=ANNULAR Sensor <br /> (ARROWS) F=FILLS <br /> Drawing of piping exit of V=VAPOR <br /> sump and UDC's.No P=PROBE <br /> underground drawing is L=Turbine I Leak Detector <br /> accurate,we cannot <br /> X=SUNIP SENSOR <br /> speculate blue prints. B=Brine Sensor <br /> .�r�•it€rse srrttx-r�z�as�tF,cr'<u-e-nit;irf�+l<st the cert�/iirr5 txlsri�inrt ta�€c7 <br /> p e�ersi€azrl pirsarrrai crrr/€rz s�a,far irbttniicr�rl�rts ,Drmrtr� S=Smart Sensor. <br /> rt t fu uctdp C=Floats&Cbams <br /> F.=E Stop <br /> Page 6 of 6 <br />