Laserfiche WebLink
<aIIen.asio@sigov.org> <br /> Subject: 7000 Michael Canlis-Tank Lining information <br /> Good afternoon, <br /> I've found some additional information on tank lining that might help you in creating the permit approval packet for <br /> submittal. The State Water Resources Control Board has LG 136fortank lining. Here is the link I found on Google: <br /> https://www.waterboards.ca.gov/ust/leak prevention/Igs/136_1.shtml <br /> This guidance document includes an example plan check fortank lining. I've copied it below so you'll have manyof <br /> the questions that will need to be answered for the tank lining permit. Please let me know if you have any <br /> questions. <br /> EXAMPLE PLAN CHECK FOR TANK LINING <br /> 1. Obtain a complete third-party evaluation of the lining material and procedures: <br /> a. A resume, including all applicable formal training experience, from personnel who conducted the evaluation (not necessary <br /> for Underwriters Laboratories). <br /> b. An affidavit from the company that received the third-party evaluation confirming that there are no mutual financial interests <br /> between lining company and testing organization (not necessary for Underwriters Laboratories). <br /> c. A description of the testing organization's formal periodic inspections of the listed/certified materials and processes. (The <br /> purpose of the formal periodic inspections is to ensure that the listed/certified materials and process continue to comply with the <br /> listing/certification.) <br /> d. A copy of the voluntary consensus standard that was used during the evaluation or a description of the equivalent test <br /> protocol, if a voluntary consensus standard was not used. <br /> e. The testing organization's raw field data, laboratory results, calculations, graphs, charts, etc. <br /> f. The conclusion of the testing organization's evaluation of the lining material. <br /> g. The conclusion of the testing organization's evaluation of the lining process. <br /> h. Limitations on the listing/certification, if any. <br /> i. A statement from the testing organization confirming that all equipment at the test site(s)was properly maintained and <br /> calibrated to the level of accuracy necessary for a valid evaluation. <br /> j. A statement from the lining applicator confirming that the materials that will be used are the same materials that were <br /> evaluated by the testing organization. <br /> k. A statement from the lining applicator confirming that the processes that will be used are the same processes that were <br /> evaluated by the testing organization. <br /> I. A description of tank lining processes to be used by the applicator. <br /> m. A statement from the company that received the evaluation describing training provided to the authorized applicator. <br /> 2. Does lining applicator have one of the following valid, unexpired contractors licenses: <br /> • General Engineering Contractor(A) <br /> • General Building Contractor (B) <br /> • Limited Specialty/Service Station Maintenance (C-61/D40) <br /> • Limited Specialty/Synthetic Products (C-61012) <br /> 2 <br />