Laserfiche WebLink
SR2500827 S]C Sheriffs Ops#1-7000 N Michael Canlis Blvd French Camp--Temporary Closure <br /> Site requests temporary closure of the 6,000 gallon underground diesel storage tank while the <br /> construction of the gasoline underground storage tank is being repaired. ❑nce the gas tank is repaired, <br /> the diesel tank will be put back into operation. <br /> Work Plan <br /> All fuel, residual liquid,solids, sludge's will be removed and handled per Health and Safety Code. <br /> Environmental Logistics will empty tank and clean tank. Documentation will be provided on any <br /> disposed hazard waste. <br /> The diesel tank will be inerted. <br /> The tank will not be filled with any noncorrosive liquids. <br /> The venting,fill and access locations and piping will be sealed with locking caps. <br /> All power service will be disconnected from all pumps associated with the use of the underground <br /> storage tank. <br /> The monitoring system will be disabled. <br /> Bagley Enterprises performs a monthly visual inspection of all locked caps. Bagley will remove at least <br /> one cap and determine if any liquids are present. <br /> All inspections and recordkeeping are currently performed and up to date. <br /> The tank has no leaks therefore, no soil contamination is present <br />