My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 8:39:01 PM
Creation date
1/21/2025 10:52:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232437
PE
2361 - UST FACILITY
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7000 N MICHAEL CANLIS RD FRENCH CAMP 95231
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AJ O A Q U I N 0nvironmental Health Department <br /> COUNtTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sots of plans &applicalions as originals will be retained by EHD) <br /> 1, Site map enclosed? YES I 1 No[n <br /> 2. Suhmit copies of ICC Service Technician and)or Installer's certificate and all manufacturer training <br /> certificates for each person inslailing or testing any componenl that is repaired a replaced. Ensure a copy of <br /> the"Sile Health and Safety Plan" is available an the jobsite as required by Tille 8. <br /> 3. Detailed description of work to be completed, List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing lacalian of repairs andlor replacements, If repairing a component, describe <br /> how Ihis will be done. (If adding piping. UDC's, or other UST equipment, or performing lank top upgrade, <br /> use the UST Instalta#ion Applicalion pages 4-9 as necessary for a timely plan review): <br /> Remove fuel from lank. Expose and remove manway (break out and remove Vx& concrete <br /> around sump, remove piping, electrical, sump, and pea gravel, shore-up excavation)_ Prepare <br /> tank for safe entry (clean, vacuum, and defume). Enter lank, inspect and repair if possible_ <br /> dose Tank. Test Tank. Re-install piping,electrical. removed tank fop. Test Tank. After approval <br /> from EHD put tank back. Into service <br /> Revised 1712024: At the time of tank entry we will perform art inspection,and if possible la rep alr,repalrs will be made <br /> See attached scope of work from Containment Salut ion sl O and Bagley <br /> 4. List of equipment to be used (Al lach manufacturer's specification sheets shaving Ihird-party approval), <br /> No equipment needed_ Containment Solutionsr+NOV, the tank company, will clean tank bottom, <br /> Inspect, and repair if possible_ <br /> 5, oeeontaminattan Procedures: <br /> a. Will piping be deccnlaminated prior to removal? YES NO [ <br /> U. Identify conlractar performing deconlamination: <br /> Name Phone (` <br /> Address City Zip <br /> 3616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.