Laserfiche WebLink
KOYFIBER GLASS SYSTEMS, L.P. Quote QT-1176223 <br /> FGS Productions RFQ Number PQO <br /> 2600 Pegasus Dr Cust Number 6324652 <br /> Bakersfield, CA 93308 Quote Date 04-Juny2024 <br /> United States Date Prinked 04-Jun-2024 <br /> Page 1 of 8 <br /> Safes Quote Acknowledgement Thin Owleissubjerllaslandard terms and=ndilionsof sale and <br /> trade=Aoms as pnnied at the erid of ihls Quote. <br /> Please Reference Quoie number on all oorrespondeoce. <br /> Bagley Enterprises Incorporated fff�s San Joaquin Sher <br /> 2370 Maggio Circle #4 100 7000 Michael Canlis Blvd. <br /> o Lodi. CA 9520 French Camp CA_ 92531 <br /> c United States United States <br /> Cust Contact ,toe Bagley <br /> Cust Email Jo ba ie enter rises_c:om Quote Date 04-Jun-2024 <br /> Ultimate lest United Slates Expiration Bate 04-Jul-2024 <br /> Currency USD Freight Terms <br /> Quoted By ChaHes_Mtlnden @ nov_corn Payment Terms Net 45 <br /> RefIR4'u Name Not Applicable- Non-Rig Application Shipping Terms FCA <br /> End User San Jus uin Sheriffs Branch t3AK4 <br /> Comments: <br /> Incoterm Location: I=CA- French Camp, CA <br /> NOV FGS will arrive and entef the 10'25M DW DRY tank and record deflection readings and clean and inspeel the interior. If a <br /> repair can he made it will be done at this time, 1f a larger repair is headed a return trip will be necessary to ship materials and <br /> send more techs, <br /> Job Site Preparations: (done by others, not NOV) <br /> - Musl have access to tank top, a minimum of a 8' x 8'area an tank top. Excavation shored to meat OSHA standards. or, if <br /> manway exist, have manway exposed, no obstruction in the way for entry and manway cover halts removed PRIOR to our <br /> arrival. <br /> Tank must be emptied and pumped dawn to 1" or less_ <br /> A person on site while CSl is on site of all times. <br /> -A drum an site to put any product in while clearing tank bottom. If tanks extremely dirty, a VAG truck alight be required to <br /> remove sludgefp rod uct laying in tank bottom_ <br /> - 1AS CFM Air compressor on site_ <br /> -Any permits requIred must be[tome by contractor on site (if any required). <br /> - Tank must be isolated from other tanks to defume and to test manway once completed. <br /> -Any leftover materials or containers to be disposed of by contractor, <br /> -All etectrica11plumbing to be removed for access to the manway lid which needs to be unbolted and ready for entry. <br /> Details <br /> Lind Item Oncri lion UM QTY Unit Price Net Price Ext Net Price <br /> 1 10549612-141 EA <br /> Charge,installetlon <br /> Item Notes. <br /> ItemlCustarner❑mmunt : 0.00% <br /> Customer RFQ Line <br /> Stocking Line: Weight: Total Weight: <br /> Harmonized Tariff Schedule Code . 0000000000 <br /> Export Control Clas5ificaoon Number: CM00 <br /> Delia` Quantify Est Ship Date <br /> 1 20 <br /> Line Notes: <br /> 2 TF-CH5 <br />