My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 8:39:01 PM
Creation date
1/21/2025 10:52:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0232437
PE
2361 - UST FACILITY
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7000 N MICHAEL CANLIS RD FRENCH CAMP 95231
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBER GLASS SYSTEMS, L.P Quote QUO-160593-Q N2RO <br /> 12230 FM 529 RdFGS Revision ID 0 <br /> KADY Producitons Houslon TIC 77041 Cult plumber 63241352 <br /> I Quote Dates 011Nov124 <br /> Date print 01INoW24 <br /> Page 1of13 <br /> Sales Quote Acknowledgement Thi$Quole is subject to standard leans srbd 4mnditm5f s of 83Ee <br /> and tirade custz�ms.as printed of the end of ih*Quote P4ease <br /> Reference Quale number on all correspondence <br /> Bill Bagley Enterprises Incorporated Ship Bagley Enterprises Inco"rated <br /> To 2370 Maggio Circle hA To cfo San Joaquin Sheriffs 7000 Michael <br /> Lodi CA United States Canlis Boulevard <br /> 95240 Lake Eisinore CA United States <br /> 92531 <br /> Cust Contact <br /> I:ust Email Quote Cato W/Nov/24 <br /> Ultimate Best United Mates Expiration Date 01/Dec124 <br /> Currency US Doliar Freight Terms Collect Freight <br /> Quoted By Charles.Munden @nov Coal Payment Torms Net 45 <br /> End User Shipping Terrrrs F A <br /> Branch BAK4 <br /> Cammii�rit>s: <br /> NOV FG3 wili arrive and enter one 10'30,ODD gallon DW DRY tank through existing men way and repair this tank <br /> that has already been inspected F S wilt drill hotel into the primary ribs and run water into the annular space to <br /> attempt to flush all qua s from the annular slaace. Once done this holes will be plugged and work can commence <br /> s . fr T,. fi <br /> repa inn g the tank. The an' >w�rll1]g sanrd ste'd 1-DO% than FGS will apply a 3 PLY lay„p ova eve Ywrinkle acid <br /> crack 360 degrees cirCumferentaally-Once this has cured a 7 PLY layup will be applied to the entire�'a'nvnc <br /> degrees from end cap to end cap. After this has Cured them we will apply internal ribs from the 9'0•clock position to <br /> the 3'0•clock position which will be covered with another 3 PLY of FG materials.,,Cnce all work has been <br /> completed the tank wlll be air soap lesled 10 ensure no lealRS, IfZ s W%I— P1aL4 seitgzvc e,6W <br /> pp}or (rpY{I*• h4aa rD Ihw�rtY oft—W L '1 w <br /> Job site P repa ralio ns. {done by n'bow. not NOV) r••►TT.W —A-MM"-$--"- '"*r 1" <br /> + ' Tank must be pumped down to 1"or <br /> * -3-55 galion drums'on site to put any remaining product or water In from tank cleaning and for Sandblasting <br /> material, corltraclorfcustomer must properly dispose of removed sludge and sandblasting material- <br /> vl to have a machine or)site to off load materials from a LTL carver. .AIL,F T- <br /> A person on site while CS is on site. -- rP+f <br /> ✓=Any permits required, must be done by tank owner or contractor, CSi Is not responsible For any such required <br /> permits. <br /> Drums of resin will be delivered,contractor on site must offload upon arrival'. — r -A F.,.-4� <br /> •k Air compressor on site, minimum of 186 CFM compressor,and contractor to keep compressor full of fuel during <br /> the duration of the work. — ,x�; -- w-'!� 1•-:0kI <br /> -''-Tanks isolated for venling tanks.and openings properly plugged for lesling tank rrmanways once work is <br /> Completed. <br /> If existing manwvay is on the tank then all electrieaVplumbing to be removed ftar access to the manway lid whrch <br />
The URL can be used to link to this page
Your browser does not support the video tag.