Laserfiche WebLink
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:CHEVRON 208118 N-4087-1-3 208118 Date: 1/15/2025 <br /> Address:3355 E.HAMMER LANE @ HOLMAN RD Name:Jesus Saldivar <br /> City/State:STOCKTON CA Technician Signature: d""'°// <br /> 4-1 <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines, and <br /> dispensers)are de-energized, and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram ro r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS r+ r r <br /> 5 Do all E-Stops shutdown power to ALL STP's l+' r r <br /> 6 Are ALL E-Stops clearly Labeled l+ r r' <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled r r r <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. rro r r <br /> 9 All safety barricades and test equipment has been properly removed r+ r r' <br /> 10 E-Stop was reset and all dispensing functions are normal ro r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2375180 <br />