Laserfiche WebLink
Hello inspector, <br /> This email is in response to the inspection report issued on 3/12/2025,to Chevron Station number 307709 located <br /> at 10858 Trinity Park Way. Stockton, CA. <br /> Below is our response to the 7 items noted in the enclosed inspection report, no further action is required: <br /> • Item#10 Monitoring system certification and leak detector testing was performed on the following dates <br /> and a test report has not been submitted to the EHD or the California Environmental Reporting System <br /> (CERS). <br /> o -Single sensor test report on 9/4/2024 following S1 sensor replacement <br /> o -Single sensor test report on 10/15/2024 following L6 sensor replacement <br /> o -Single sensor test report 1/20/2025 following S3 sensor replacement <br /> ■ Please see attached monitoring certificates. <br /> • Item#14 An overfill prevention equipment inspection was performed on 3/29/24 and a test report was <br /> submitted on 5/4/24, 6 days late. <br /> o We have spoke with our testing contractor to ensure that results are not submitted late <br /> • Item#47 Liquid with a sheen was found in the 3/4 UDC. Liquid was also observed in the 87 STP sump, and <br /> the B20 STP sump. <br /> o Please see attached work order dated 3/21/25 <br /> • Item#58 Update the Facility Employee Training Certificate to contain the accurate information and submit <br /> a copy of the updated form to the EHD. <br /> o Please see attached training certificates. <br /> • Item#59 Maintenance and monitoring records for the last three years were not found on site. <br /> o -Single sensor test report on 9/4/2024 following S1 sensor replacement <br /> o -Single sensor test report on 10/15/2024 following L6 sensor replacement <br /> o -Single sensor test report 1/20/2025 following S3 sensor replacement <br /> ■ Attached maintenance records have been placed on site <br /> • Item#72 The following UST components were replaced, and a permit was not obtained from the EHD, and <br /> no notification was made to the EHD. <br /> o -S1 sensor replaced on 9/4/2024 <br /> o -1_6 sensor replaced on 10/15/24 <br /> o -S3 sensor replaced on 1/20/25 <br /> ■ Please see permit attached received 4/10/25 <br /> • Item#77 An inspection was last done on 3/7/24 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance.This information was required to be <br /> submitted by 4/6/24.This information was received on 4/22/24, 16 days late. <br /> o It is not our intention to be late with our RTCs, but unfortunately, if there is a parts or retest delay, <br /> this can happen. We always strive to return all sites to compliance within the required time frame. <br /> Please note that I was unable to edit the Corrective Action statement portion of the return to compliance <br /> form. They are listed in this email. <br /> Please feel free to contact me should you have a question. <br /> Debbie Rewe <br /> 2 <br />