Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? <br /> El12-06-2023Has spill container testing been completed within the past <br /> 1 <br /> ❑ 12-06-2023 <br /> 2 months? <br /> Has overfill prevention equipment inspection been completed within <br /> 11-15-2021 <br /> the past 36 months? <br /> ❑ ❑ <br /> Has secondary containment testing been completed within the past <br /> 36 months? <br /> 11 El03-16-2022Has tank tightness testing been completed within required ❑ ❑ <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ <br /> timeframes? <br /> Other Test/ Maintenance: ❑ ❑ ❑ <br /> Other Test/ Maintenance: ❑ ❑ ❑ <br /> Other Test/ Maintenance: ❑ ❑ ❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility IR ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />