Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Farm <br /> v. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System OeH f+ca Lion Fa nrr must,be prepared for each control panerr. <br /> Make of Monitoring ystern Model of Monitoring System Software Version Installed <br /> Control PaneJ Control Panel <br /> 1leeder-Root TLS 50 <br /> Attach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either; F1 Monitoring System Set-up ® Alarm History Report <br /> roll monitoring equipment is operational per manufacturer's specifications? ( � <br /> Secondary containment systems are tree of damage, debris, or liquid? ❑� � <br /> Are the audible and visual alarms operational" <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual ® © r] <br /> buildup on #[oats, and ) tested for functionality and confirmed operational' <br /> Are all sensors installed to detect a release at the earliest opportunity in the ® 8 0 <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? El ® 11 <br /> Was the monitoring control panel's backup battery visually Inspected, functionally ® 0 ffl <br /> tested, and confirmed operational" <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected <br /> Does the turbine automatically shut down it the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut dowry? <br /> Check all that apply) MSurnp EJUDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all ❑I rI Fr/1 <br /> communication equipment operational? <br /> Describe all answers marked rc o" or "fail" and proposed remedy in Section 9_ <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />