Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> Check this box�'f tank gauging is used only for inventory control, <br /> Check this box ` o tank gauging equipment is installed. Yes No A <br /> Do not complete t ' section if either box is decked, <br /> All wiring has been: 1) vi a#ly inspected for kinks, breaks and proper try and r] ® r) <br /> termirration; and testedWground faults? <br /> Were all in-tank gauging prob visually inspected for damage and; sidue buildup <br /> to ensure that floats move frael , unctiona11 y tested, and confirmed o perationaI? <br /> Was accuracy of system's product Orel readings tested? El El El <br /> Was accuracy of system's water Jeve eadings tested? <br /> Were all probes reinstalled properly? <br /> Were all iterns on the equipment manufact is maintenance checklist completed' M El El <br /> Probe lD Probe Model Tanks Monitored Pass fail <br /> 9. COMMENTS <br /> Describe all answers marked ' o" or "Earl"and proposed remedy, -- -- <br /> List all monitoring equi orrrent either replaced o r repaired. <br /> Tested alb sensors programmed for positive shutdown of diesel STP <br /> Page 5 of 6 <br />