Laserfiche WebLink
5. To determine the Length L, add the square of"Y" (Y•Y) and the square of"X" <br /> (x�x) and take the square root of the sum. <br /> L _ (Y' ' } <br /> 6. The threaded rod will screw into the poppet cam to a depth of/4". Add '/4" <br /> to the length L previously calculated to determine the total length for cut. <br /> 7. Apply thread sealant to '/4" at the end of the rod to be screw onto the <br /> poppet cam. Do not over thread. When installed properly the float rod should <br /> swing back and forth freely. <br /> 8. Apply pipe dope to NPT thread and install the valve with the float hanging in the <br /> vertical position. <br /> 9. Note: There is a marked line on the valve as shown in Fig 6 to indicate the <br /> direction of swing for the float. Be sure to install it so that there is no obstruction <br /> to the swing of the float. The float will swing to the right or left of the marked line <br /> for shut off. <br /> Figure 5 Length Figure 6 Marked <br /> of Rod to be Cut L i ne showi ng <br /> Di recti on of <br /> FI oat <br /> marked line <br /> El <br /> 10. For UST installations of Waste Oil - need to determine "K" the riser pipe and <br /> internal spill container nipple height for the proper length 2" pipe. See figure 7 for <br /> measurements. Add 2" to this measurement for threads to properly sit through 4" <br /> adapter for coupling and cap. (2" Pipe contractor supplied. Length based on <br /> installation instructions) <br />