My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 7:36:44 PM
Creation date
1/30/2025 10:21:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231995
PE
2361 - UST FACILITY
FACILITY_ID
FA0006438
FACILITY_NAME
UNITED #5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1403 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Spill Container Testing Report Form <br /> 6. SPILL CONTAINER DETAILS <br /> Test Method Developed by N Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum N Hydrostatic <br /> Tank ID T-1 Diesel T-2 87 T-3 91 W.O. <br /> Spill Container Manufacturer: OPW OPW OPW OPW <br /> Method of Cathodic Protection N Nonmetallic N Nonmetallic N Nonmetallic N Nonmetallic <br /> ❑ Other ❑ Other ❑ Other ❑ Other <br /> Is the spill container minimum N Yes N Yes N Yes N Yes <br /> capacity five gallons excluding El No* El No* El No* El No* <br /> riser volume? <br /> ❑x Drain N Drain N Drain N Drain <br /> Method to keep spill container El Pump El Pump El Pump El Pump <br /> empty ❑ Other ❑ Other ❑ Other ❑ Other <br /> Spill Container Test Results N Pass N Pass N Pass N Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> Tank ID <br /> Spill Container Manufacturer: <br /> Method of Cathodic Protection ❑ Nonmetallic ❑ Nonmetallic ❑ Nonmetallic ❑ Nonmetallic <br /> ❑ Other ❑ Other ❑ Other ❑ Other <br /> Is the spill container minimum ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> capacity five gallons excluding ❑ No* ❑ No* ElNo* ❑ Now <br /> riser volume? <br /> ❑ Drain ❑ Drain ❑ Drain ❑ Drain <br /> Method to keep spill container ❑ Pump ❑ Pump ❑ Pump ❑ Pump <br /> empty ❑ Other ❑ Other ❑ Other ❑ Other <br /> Spill Container Test Results ❑ Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all answers marked "Other," "No,"or "Fail"and each proposed remedy. <br /> Notes: <br /> 1. T-3 91 Spill bucket failed initial test, replaced the drain valve, retested, and <br /> passed. <br /> * Mark here if: <br /> ❑ Spill containers do not have a minimum capacity of five gallons and require replacement. <br /> Additional copies of this page may be attached. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.