My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 7:53:47 PM
Creation date
1/30/2025 11:46:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0546066
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN, INC #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1829 N WILSON WAY STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. Ifs-TANK GAUGING TESTING j <br /> Z Check this box if tank gauging is used only for inventory control. <br /> L Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2) tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup L ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed o erational? <br /> Was accuracy of system's product level readings tested? Lj ❑ L) <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ El ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fars <br /> Lj Li <br /> Lj Lj <br /> Ll ❑ <br /> Q Q <br /> ® Q <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No'or ''Fail°'and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> REMOVED A CUPS WORTH OF LIQUID FROM DSL SUMPS. WAS LEFT DRY AND LET THE OFFICE KNOW, TOOK <br /> PHOTOS. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.