Laserfiche WebLink
TABLE 4 <br /> WELL CONSTRUCTION SUMMARY <br /> QUICK-N-SAVE #1 STOCKTON <br /> 1901 South El Dorado Street <br /> Stockton, California 95206 <br /> Screened Casing Boring Well Screen <br /> Installation Interval Diameter Diameter Depth Slot Size <br /> Well Date (feet-bgs) (inches) (inches) (feet) (inches) <br /> Groundwater Monitoring Wells <br /> MW-1 3/16/2004 35-55 2 8 55 0.020 <br /> MW-2 3/17/2004 25-45 2 8 45 0.020 <br /> MW-3 3/16/2004 35-55 2 8 55 0.020 <br /> MW-4 3/17/2004 30-50 2 8 50 0.020 <br /> MW-5 6/8/2010 75-80 2 8 80 0.020 <br /> MW-6 6/8/2010 20-40 2 8 40 0.020 <br /> MW-7 6/9/2010 75-80 2 8 80 0.020 <br /> MW-8 6/9/2010 20-40 2 8 40 0.020 <br /> MW-9 6/10/2010 95-105 2 8 105 0.020 <br /> MW-10 6/11/2010 75-80 2 8 80 0.020 <br /> MW-12 5/26/2015 75-80 2 8 85 0.020 <br /> MW-13 5/27/2015 35-50 2 8 50 0.020 <br /> MW-14 6/2/2015 75-80 2 8 80 0.020 <br /> MW-15 5/29/2015 75-80 2 8 80 0.020 <br /> MW-16 Proposed 95-105 2 8 105 0.010 <br /> MW-17 Proposed 70-80 2 8 80 0.010 <br /> Remediation Wells <br /> EWI 8/17/2005 35-55 4 10 55 0.030 <br /> EW2 8/2/2010 15-40 4 10 40 0.030 <br /> EW3 8/2/2010 25-45 4 10 45 0.030 <br /> VW1 3/16/2005 15-35 2 8 35 0.030 <br /> VW2 3/16/2005 15-35 2 8 35 0.030 <br /> VW3 3/16/2005 15-35 2 8 35 0.030 <br /> VW4 3/16/2005 15-35 2 8 35 0.030 <br /> FREY Environmental, Inc. Table 4 Project No. 1095-01 <br />