Laserfiche WebLink
QQ HP10 MW-16 Q <br /> Q TH S?BEET <br /> Q FpUR <br /> ❑ to <br /> ❑ n. n. � p <br /> a , G <br /> ❑ % 0 0 <br /> 1�L� /❑ PT�-1 5' ` C[35 1� ` ❑ <br /> ( 2/5/2/22) <br /> ❑ ❑ <br /> N/ V 4 <br /> ❑ O <br /> ❑ / ❑ CPT5 MW-14[466] Q •B9 ❑ <br /> CPT7 311 Q ❑ <br /> B-5 • Q <br /> ❑ MW-2 /0-7 ❑ <br /> < MW 9 MW-10 -8 Q ?0' Q EW-2 Q <br /> B-2 C/2 CPT4 EET �❑ <br /> VW-1 $TR <br /> - CPT6 FIFTH <br /> STREET CPT1• EW3 <br /> � MW-15 <br /> FIFTH MW-1 B-4 MW-5 811 3,2501 <br /> CPT8 CPT1 - 05' C3 <br /> MW-6& VW-21 %1 • D<0.5] r <br /> B_1 BMW-7[ND<0.5] Q ( 2/5/22) 1 <br /> EW-1 MW-3 MW-1 MW-1 G y C3 CDVW-3 \ [3,110] r N <br /> MW-4 • MW-13 Z <br /> CPT3 \ <br /> SITE Q ❑C °9 Q <br /> G� p <br /> C3 <br /> 5. y G Q ❑ <br /> y ❑ 70 <br /> n \ CPT9-70' m <br /> ] ❑ <br /> � �p (11/29(11/29/22) <br /> TA �� Q CPT10-105' <br /> q <br /> n (12/5/22) <br /> "�— HIP 0 n. <br /> ❑ Q0 <br /> ❑ MW-17 <br /> T <br /> QSIXTH STREE <br /> LEGEND NOTES: SITE VICINITY SKETCH SHOWING <br /> BENZENE CONCENTRATIONS IN <br /> MW3 MW16 PROPOSED MONITORING 1. All locations and dimensions are approximate. DEEPER SCREENED (75'-80- & 95'-105') <br /> MONITORING WELL LOCATION ® WELL LOCATION 2. Site Sketch from Google Earth Aerial Photo. <br /> GROUNDWATER ON <br /> EW-1 GROUNDWATER EXTRACTION WELL HP1 PROPOSED HYDROPUNCH FEBRUARY 8, 9 & 10, 2023 <br /> LOCATION O BORING LOCATION <br /> QUICK-N-SAVE #1 <br /> VW-2 SOIL VAPOR EXTRACTION WELL WITH BENZENE CONCENTRATION IN 1901 SOUTH EL DORADO STREET <br /> LOCATION GROUNDWATER IN pg/L ON FEBRUARY <br /> [3,110] 8,9&10,2023;ND=NOT DETECTED STOCKTON, CALIFORNIA <br /> B1 SOIL BORING LOCATION ABOVE LABORATORY DETECTION <br /> LIMIT; NS=NOT SAMPLED FREYENVIRONMENTAL, INC. <br /> CPT3 CPT SOIL BORING LOCATION CONTOUR OF EQUAL BENZENE 0 100 200 CLIENT: PROJECT No.: DATE: <br /> —100— CONCENTRATION IN GROUNDWATER THE SHARMA FAMILY TRUST 1095-01 03/2023 <br /> (IN pg/L,ON FEBRUARY 8,9&10,2023) FILENAME: FIGURE 11 <br /> APPROXIMATE SCALE IN FEET I 1095-01-Q1-23.DWG <br />