My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:47:23 PM
Creation date
1/31/2025 3:06:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231470
PE
2361 - UST FACILITY
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
816 E FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 6. SENSOR TESTING RESULTS <br /> List only sensors tested on date of this certification. List "Sensor ID"as labeled in system <br /> programming. Additional copies of this page may be attached to accommodate all sensors tested. <br /> Sensor lD Sensor Model Component(s) Monitored Pass Fail <br /> L-1 208 DISP 1-2 ❑✓ ❑ <br /> L-2 208 DISP 3-4 El ❑ <br /> L-3 208 DISP 5-6 0 ❑ <br /> L-4 420 87/91 ANNULAR ❑✓ ❑ <br /> L-5 420 DIESEL ANNULAR 11 ❑ <br /> L-6 208 87 STP ❑✓ ❑ <br /> L-7 208 91 STP 0 ❑ <br /> L-8 208 DIESEL STP ❑✓ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe all answers marked "No"or "Fail'and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.