My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:15:08 PM
Creation date
1/31/2025 3:06:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0507204
PE
2361 - UST FACILITY
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2360 W GRANT LINE RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> Ll Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No 1A <br /> 0 3 GPH L 0.1 GPH LJ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? 0 D Ell <br /> For emergency generator tank systems, does the LLD create an audible and visual LA J 0 <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is Ll Lj Wi <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically strut off if any portion of the Ll L] <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected Ll Ll <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 Lj Ll <br /> Were all LLDs confirmed operational within regulatory requirements? E-) 13 <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> T4 Vaporless LD-2000 RUL PROD. LINE R) Li <br /> T5 Vaporless LD-2000 MUL. PROD. LINE 0 L) <br /> T6 Vaporless LD-2000 PUL. PROD. LINE ® Li <br /> Li Ll <br /> Ll Li <br /> ® li <br /> Ll D <br /> J Lj <br /> D Ij <br /> Ll Lj <br /> Li D <br /> Li Q <br /> Describe ail answers marked "'No"or "Fail"'and proposed remedy in Section 9. <br /> List afl monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.