Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 <br /> Are both vent and tank riser piping 0 Yes F] Yes 0 Yes © Yes <br /> secondarily contained? 0 No © No © No © No <br /> OPE Model 71so 71so <br /> What is the OPE response when 0 Shut off 0 Shut off © Shut off El Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts ©Restricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> © Audible © Audible © Audible rl Audible <br /> Alarm Alarm Alarm Alarm <br /> 0 Visual © Visual r Visual [M Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* Yes* Yes* © Yes* <br /> that may interfere with the OPE operation? F1 No No © No No <br /> At what level in the tank is the OPE set to <br /> 78.125" 76.625" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 92.38% 91.63% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to E Yes 0 Yes* © Yes* Yes* <br /> respond when the stored substance © No © No © No © No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results 0 Pass r Pass © Pass ® Pass <br /> © Fail © Fail r] Fail r] Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />