Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Map <br /> Site Address: <br /> Jack N the Box Store <br /> TLS 350 <br /> Carwash <br /> P71 o <br /> -I <br /> 11/ <br /> 12 <br /> X P <br /> X S <br /> XX Die L A L <br /> Vent P <br /> Rnx x <br /> X F X V <br /> x V X <br /> F <br /> X F <br /> X <br /> X L <br /> X P <br /> KEY <br /> A=ANNULAR Sensor <br /> F=FILLS <br /> V=VAPOR <br /> *PIPING P=PROBE <br /> (ARROWS) DATE SITE MAP DRAWN: L=Turbine/Leak Detector <br /> Drawing of piping exit of X=SUMP SENSOR <br /> sump and UDC's.No B=Brine Sensor <br /> underground drawing is S=Smart Sensor <br /> accurate,we cannot N nre gromzli7e�w-exol irsiWe fa!]ureerfr6mgY�An R rx a C=Floats&Chains <br /> speculate blue prints. sioreal mn o mrl us sd f $ �m�. E=E Stop <br /> Fps of �� �'.fa'rfornruiwxr3F�T � <br /> (� � 7»1lascde <br /> Page6of6 <br />