My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2026 11:44:53 AM
Creation date
2/5/2025 2:08:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231092
PE
2361 - UST FACILITY
FACILITY_ID
FA0001946
FACILITY_NAME
EL DORADO FOOD MART
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1901 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for El Dorado Food Mart as of March 25, 2025. <br /> Open violations from August 14, 2024 inspection <br /> Violation#77-2030073-Facility has corrected cited violations within 30 days of receiving report. <br /> OBSERVATION:An inspection was last done on 8/8/2023 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 9/7/2023. This <br /> information was received on 11/28/2023, 112 days late. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include all <br /> of the recommendations made in the report.The operator shall submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.