My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:50:00 PM
Creation date
2/5/2025 4:30:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231477
PE
2361 - UST FACILITY
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
341 E MAIN ST RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 1-87 2-91 <br /> Tank Manufacturer XERXES XERXES <br /> Tank Capacity 15K 15K <br /> Test Start Time Exempt Exempt <br /> Initial Reading NA NA <br /> Test End Time NA NA <br /> Final Reading NA NA <br /> Change in Reading NA NA <br /> Pass/Fail Criteria NA NA <br /> Tightness Test Results ❑ Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-87 2-91 <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 8:30 8:30 <br /> Initial Reading 5 Psi 5 Psi <br /> Test End Time 9:30 9:30 <br /> Final Reading 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.