Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:5/17/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: J&L MARKET 8115 S EL DORADO ST STOCKTON,CA <br /> S ELDORADO STREET <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STOREr . .10. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8. . / . . . . . . . . .6. . . . . . . . . . . <br /> . . . . . . . . 91. . . . . . . . ..DIE . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . C . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . C . <br /> L <br /> . . . E L <br /> r P x O X . . . . . . . . . .T. . . . . . . . . . . . <br /> E <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L <br /> FO P X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4. . . . . .2. . <br /> 87. . <br /> C . . . . C . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3. . . . . . . . . . . . . . .1. . . . . . . . . . <br /> M <br /> 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> TKEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> H A=Arvrvur.AR Sensor ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' <br /> E <br /> S F=FILLS <br /> V=VAPOR . . . . . . . . . . . . . . . . <br /> R P=PROBE . . . . . . . . . . . . . . . . ❑ TLS <br /> O L=Turbine/Leak Detector . . . . . . . . . . . . . . . 350 <br /> A X=SUMP SENSOR . . . . . . . . . . . . . . . <br /> D B=Brine Sensor . . . . . . . . . . . . . . . S <br /> S=Smart Sensor . . . . . . . . . . . . . . . M <br /> C=Floats&Chains 0 <br /> E=E Stop G <br /> OFFICE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .TO 1-5. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1. CARBON <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O CANISTER <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Co P.V.VENTS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -*PIPING, <br /> .N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing ofpiping <br /> exit of sump and <br /> UDC's.No <br /> underground <br /> Any items underground that are not visible to the certifying technician area drawing is <br /> professional opinion only and are solely for informational purposes. Drawing not to accurate,we <br /> scale. catmot speculate <br /> blue prints. <br /> Date map was drawn: 5119/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />