My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 10:53:03 AM
Creation date
2/7/2025 3:33:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231320
PE
2361 - UST FACILITY
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
35 N CHEROKEE LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all: that apply.) Yes No NA <br /> A 3 GPH EJ 0.1 GPH ❑ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? A ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flaw through the pipe when a A LJ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ❑ ❑ 11 <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> mon itoririg system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ❑ ❑ 71 <br /> for kinks and breaks? <br /> Were all items an the equipment manufacturer's maintenance checklist completed? 0 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? J Ij <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> T1 Vaporless LD-2000 87 Ed ❑ <br /> T2 Vaporless LD-2000 91 Q <br /> T3 Vaporless LD-2000 DSL ❑. Q <br /> Q Q <br /> ❑ Q <br /> ❑ Q <br /> ❑ Q <br /> .❑ Q <br /> ❑ Q <br /> Q Q <br /> Describe all answers marked "No"or"Fail"and proposer!remedy in Secrion 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.