My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 10:53:03 AM
Creation date
2/7/2025 3:33:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231320
PE
2361 - UST FACILITY
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
35 N CHEROKEE LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping c Yes r Yes r Yes r Yes <br /> secondarily contained? f: No r No r' No r' No <br /> OPE Model oPW <br /> W Shut off ' Shut off ' Shut off ' Shut off <br /> Flow Flow Flow Flow <br /> ' Restricts ' Restricts ' Restricts ' Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) '- Audible ' Audible ' Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ' Visual ' Visual ' Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r No r No r No r No <br /> At what level in the tank is the OPE set to 11427 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.4 <br /> Is the OPE in proper operating condition to r Yes r Yes r' Yes r' Yes <br /> respond when the stored substance reaches No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass r Pass r Pass r Pass <br /> r Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Unable to remove drop tubes for 91 and DSL. <br /> *Mark here if: <br /> ''- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.