Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address' AG SPANOS.tET CENTER 4800 S AIRPORT WAY STOCKTON CA 95206 <br /> CONTALnMNT <br /> sc�..secamax� <br /> PROBE . . . . . - . . . . . . . . . . - . <br /> �Ts--rule s�SUMP _ <br /> (CO13PQ�L BFtC77 _ - �`5 <br /> . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> AICL <br /> . T-NxI . <br /> FILTEII <br /> . - - - Ts <br /> . . . . . . . . . . . . . . . - <br /> . . . . . . . . . . . . . . . . . roa�5 <br /> 1s <br /> . . . . . . . . . . . . . . . . . . . ._ Took <br /> KEF TANK 1. TANK 2_ TANK 2_ 3 TANK 3 <br /> A=.�LMMMAR Sensor — — — <br /> F=F IS <br /> C=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) <br /> P=PROSE Drawiu_of piping <br /> L=Turbine I Leak Detedw sirs'Im s Irm&1'groraritimif are 17o1 tiisible roils cerdingierDaridan tre a nit of euaap and <br /> t=SU]IPSY-NSOR P'4fsssrarxriaprraaeraricrrrdsresds{t,fairdFoiaruivmlprn a £hmrrrg L'DC's.\o <br /> B=Brine Sensor M110 acdc tutdereraund <br /> 5=Smart Sensor dxanzo�L <br /> C=Floats&Clain- accurate,u,e <br /> E=£Stop :aonot spectiat <br /> Date map was drawn:211V1g. bke <br /> . <br /> Instructions <br /> If you already have a diagram that shows at required information,you may include it,rather than this page,with your Monitoring System CertsFeation. On your site plan, <br /> show the q--nerat layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monhunrV tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other setandary containment areas:mechanical or e6ettronic line leak detectors;and in-tank liquid level <br /> probes('rf used for leak deiectloni. In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />