My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 9:15:01 PM
Creation date
2/11/2025 1:06:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231487
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Escalon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1329 ESCALON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS 71 <br /> Tank ID (one OPE per column) T1: 87 M T2: 91 <br /> Are both vent and ank riser piping E Yes E Yes ❑ Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model 846390-111 846390107 <br /> What is the OPE response when activated? ❑ Shutoff ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> E Audible E Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> E Visual E Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictor installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? E No E No ❑ No ❑ No <br /> At what level in thE tank is the OPE set to 100.27 76.82 <br /> activate? Inches fom bottom of tank <br /> What is the perce t capacity of the tank at 90 90 <br /> which the OPE activates? <br /> Is the OPE in prop r operating condition to E Yes E Yes E Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the desigr ated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results E Pass E Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> 1) Each tank has external audible and visual alarm <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies o this page may be attached. <br /> Attach tank charts), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.