My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 8:35:14 AM
Creation date
2/13/2025 10:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231604
PE
2361 - UST FACILITY
FACILITY_ID
FA0000650
FACILITY_NAME
GAS AND SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1002 FRONTAGE RD RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> ® Check this box if tank gauging is used only far inventory control. -- <br /> i <br /> [ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> (Do not complete this section if either box is cheeked�_.........._...___ _...._....__...__._._.._ _. ........ _ _ .-....._.... <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br /> termination; and 2) tested for ground faults? 17 <br /> Were all in-tank gauging probes visually inspected far damage and residue buildup � � <br /> to ensure that floats move freely, functionally tested 17 <br /> , and confirmed a erational? _ <br /> Was accuracy of system's product level readings tested? <br /> Was accuracy of system's water level readings tested? El El 17 <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment i _.._„_-_ manufacturer's maintenance checklist completed. IC <br /> Probe 1D Probe Model Tanks Monitored Pass Fail <br /> _..._............ ® . __® <br /> ri rfW9 <br /> 12 <br /> Describe all answers marked "Na" or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> I <br /> I <br /> i <br /> I <br /> i <br /> i <br /> I <br /> i <br /> i <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.