Laserfiche WebLink
Underground Storage Tank <br /> verl~ili Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID Torre OPE per column) � - --- regular super <br /> Are both vent and teak riser piping Yes 71 Yes Yes L7 Yes <br /> e and rily contained? Ki No Lx No No 1L7 No <br /> OPE Model OPW 61 SO I QPW 71$O <br /> What is the OPE response when Shut off Shut off S� ut off L Shut oft <br /> activated? Flow Flow Flow Flow <br /> (Check alf thal'apply-) R Restricts Restricts L7 Restricts TI Restricts <br /> Flow Flow Flow Flow <br /> E. Audible L7 Audible rs' Audible 1] Audible <br /> Alarm Alarrrl Alarm Alarm <br /> L Visual Visual L Visual visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes' r, Yes Yes' ri Yes* <br /> that may interfere with the OPE operatlon7 No No No No ' <br /> At what level in the tank is the OPE set to <br /> activate? !riches from bottom of lark 90.7 " 91.1 5" <br /> What is the percent capacity of the tank at <br /> which the OPE activates" 85% 8 % <br /> Is the OPE in proper operating condition to IrL Yes Yes Yes' L Yes' <br /> respond when the stored substance T No No Irl No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY of TESTING RESULTS <br /> Pass : Pass I I Pass Pass <br /> OPE Inspection Results C pall Faiii 1 11 Fail L7 Fail <br /> a. COMMENT _ <br /> Describe alf answers fnarkCed ` o"Or+"Fai1°and proposed ramrod}. <br /> Lost atf moo}toring equipmeru either replaced or repaired <br /> * Mark here if <br /> r Flow restrictors interfere with overfill prevention and equipment repairs required <br /> Additional copies of this page may be attacrev. <br /> AHach tank chart(s). rrreasumments, calculations, and In-Ta17k Serop report(s) <br /> Page 2 of <br />