Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T-1 87 T-2 91 T-3 Diesel <br /> Are both vent and tank riser piping ■ Yes ■ Yes ■ Yes ■ Yes <br /> secondarily contained? ® No ® No ® No ■ No <br /> OPE Model FFS Defender FFS Defender FFS Defender <br /> What is the OPE response when activated? ® Shut off ® Shut off ® Shut off ■ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ®Restricts ®Restricts ®Restricts ■Restricts <br /> Flow Flow Flow Flow <br /> ■ Audible ■ Audible ■ Audible ■ Audible <br /> li <br /> Alarm Alarm Alarm Alarm <br /> ■ Visual ■ Visual ■ Visual ■ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ■ Yes* ■ Yes* ■ Yes* ■ Yes" <br /> that may interfere with the OPE operation? ® No ® No ® No ■ No <br /> At what level in the tank is the OPE set to 85.75" 86.375" 86.375" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94.48% 93.21% 91.42% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes ® Yes ■ Yes <br /> respond when the stored substance ■ No ■ No ■ No ■ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ® Pass ■ Pass <br /> ■ Fail ■ Fail ■ Fail ■ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ■ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />