My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2026 11:56:50 AM
Creation date
2/19/2025 11:54:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231488
PE
2361 - UST FACILITY
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2501 JACKSON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS <br /> SOLUTIONS DELIVERED <br /> August 6, 2024 Page 1 of 1 <br /> Monica Farhat <br /> Boyett Petroleum Corporate Office <br /> 601 McHenry Avenue <br /> Modesto, CA 95350 <br /> Office: 209-549-5612 <br /> Cell: 209-495-6243 <br /> Email: mfarhat@boyett.net <br /> Regards: Boyett Petroleum#98 -2501 Jackson Ave Escalon, CA Diesel Spill Bucket Scope of Work <br /> Monica, <br /> CGRS is pleased to provide the following Scope of Work to make repairs found during the recent <br /> monitoring certification and CUPA inspection. CGRS, Inc. is a California Licensed Contractor, <br /> License#803616 ---A/C-61/D40/D64/HAZ. All technicians performing tests and certifications are <br /> individually certified by the equipment manufacturers and hold applicable International Code Council <br /> (ICC) certificates. <br /> 1.0 SCOPE OF WORK: <br /> Task I- Pre-construction activities <br /> • Submit plans and permit application to San Joaquin County Environmental Health <br /> Department (CUPA) for repairs and a cold start permit <br /> • Order parts <br /> • Prepare site for construction as required <br /> Task ll—Spill Bucket& Overfill Valve Installation <br /> • Saw cut, demo, and haul one (1) 4' x 4' area around the diesel spill bucket <br /> • Install Franklin Fueling double wall Defender Series Spill Bucket and Defender Series <br /> Overfill shut off valve on the diesel product tank <br /> • Remove "ball float valve" on the 87 product tank <br /> • Provide Mechanical Leak Detector testing of prior contractor installation <br /> • Provide pretest of spill bucket <br /> • Place#4 rebar 18" on center each way and pour back 2500 PSI concrete <br /> Task III— Finalize project <br /> • Call for required inspections & provide OPI Inspection/testing <br /> CGRS anticipates onsite construction will take 2-3 days. <br /> Please call or email me should you have any further questions regarding this Scope of Work. <br /> Submitted by: CGRS, Inc. <br /> CGRS, Inc. 5444 Dry Creek Rd. <br /> Sacramento, California 95838 <br /> Ades 7;;#,Oraa Cell (626-627-8316) <br /> Matt Thomas State of CA Contractors License#803616 <br /> Business Development Class "A/C61/D40/D63/HAZ" — HAZWOPER Certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.