Laserfiche WebLink
EQUIPMENT LIST � <br /> 00 <br /> --- 1. 1 70555101C1-GKT FRANKLIN FUELING DIRECT BURY Q LO <br /> GRADE LEVEL 5-GAL SPILL BUCKET O <br /> 2 <br /> 1 2. 1 77720102 EBW FILL CAP `L U U <br /> 3. 1 77830101 EBW FILL ADAPTER <br /> Components Z LU <br /> _ � 4. 1 708592902 FRANKLIN FUELING DEFENDER W U <br /> ®Pre-flanged aluminum top drop tube OVERFILL VALVE WITH DROP vS of I- <br /> ©Roll-crimped top fitting/drop tube 4 ; TUBE UZ <br /> }W <br /> ®Protective float sleeve U <br /> o io <br /> Float(shielded by float sleeve) U <br /> C TANK TOP <br /> O Valve assembly — <br /> 7 <br /> 0 Magnetically-coupled actuator ) W. <br /> e Threaded bottom drop tube j 4. Q3 <br /> 95%OF til <br /> TANK VOLUME (`V <br /> 1 1d'(152mm)MaNm"m <br /> 1. <br /> 4. <br /> Operation <br /> W <br /> The OPV is designed with a primary shutoff that will activate between 85%and 92%of tank volume, C:j oO <br /> depending on tank diameter.After the primary shutoff is actuated the flow through the valve is limited <br /> to less than 30 Ipm 8 gpm(30 Ipm).A secondary positive shutoff will occur at 95%tank volume if filling W <br /> continues.As the liquid level in the UST approaches 95%capacity,the liquid level raises the float.As P o <br /> the float rises it actuates the external/internal magnetic couplers which release the flapper to be <br /> closed by the flow of product.As the float continues to rise,the internal mechanism pushes the flapper <br /> further into the product flow to allow actuation at high or low flow rates.This sudden reduction in flow W o <br /> caused by the primary flapper closing creates"line shock"to the fill hose which signals the delivery Y Lu <br /> driver that the tank is nearing 95%capacity.As the float continues to rise to the 95%fill level,the Z <br /> secondary closes,completely stopping the flow of fuel. Y oO)< <br /> Approvals&Certifications <br /> Q O <br /> •UL 2583listed and ULc listed,MH21090. Q <br /> •CARB certified,VR-101-U(FFS)and VR-102(OPWe). W�0 <br /> N <br /> •ATEX 2014/34/EU approved. } LUO <br /> •EN13616certified. M <br /> •KIWA BRL-K636/03 certified. <br /> Ordering Information <br /> di <br /> 708592902 I Defender Series"'overfill prevention valve with 10'(3048mm)top drop tube,10'(3048mm)bottom drop tube PG.2 <br />