My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 9:27:59 PM
Creation date
2/20/2025 11:03:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0522448
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0015274
FACILITY_NAME
KESAR PETROLEUM INC
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
717 W EIGHTH ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used:vacuum motor, gauges in -Hg, stop watch /timer <br /> Tank ID Super Regular Diesel <br /> Tank Manufacturer Xexes Xexes Xexes <br /> Tank Capacity 8000 20000 12000 <br /> Test Start Time n/a n/a n/a <br /> Initial Reading n/a n/a n/a <br /> Test End Time n/a n/a n/a <br /> Final Reading n/a n/a n/a <br /> Change in Reading n/a n/a n/a <br /> Pass/Fail Criteria n/a n/a n/a <br /> Tightness Test Results ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type X Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: PSI pressure gauges, air, stop watch / timer <br /> Pipe Run ID Super Regular Diesel <br /> Pipe Manufacturer AO Smith AO Smith AO Smith <br /> Test Start Time 60 minutes 60 minutes 60 minutes <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 0 minutes 0 minutes 0 minutes <br /> Final Reading 5psi 5psi 5psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0/60 minutes 0/60 minutes 0/60 minutes <br /> Tightness Test Results X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria 0/60 minutes 0/60 minutes 0/60 minutes 0/60 minutes <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.