Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> U ST Monitoring Site Plan <br /> SiteAddrm: Casio 7906 N El Dorado Stockton 95210 <br /> S T L F V <br /> x E A H <br /> TLS 35OR� _ . . . . P <br /> L�J M <br /> M <br /> �— E- <br /> 87 Slave T F V R <br /> A <br /> x �. <br /> P <br /> 3 t N. <br /> E. <br /> -ap ass. . . . . _ . . .4 a7xaaA� . fe <br /> . . TL F V <br /> P <br /> I <br /> KEY <br /> A=ANNULAR +plpLVG+ <br /> F=FILLS <br /> T=TL-RBL\7E (.1RROn S) <br /> P=PROBE Drawing of <br /> V_VAPOR . . . . piping exit of <br /> X=SnIP SENSOR sump and IIDC's. <br /> L=Leak Detector No underground ! <br /> XI=NIaawa}' in+rtent rntdsrgasaafthatm-eProtxisrb;eto filar centfiingrecJantianasa Ott i° <br /> B=Brine Sensor p-gfscsiaetl oprrior ordt and ars sdsh for rr,{orvnniow1propxa Dra-rrng .the <br /> I=Smart Sensor rtnt to seals <br /> cannot speculate <br /> S=STP blue Pam' <br /> C=Floats&CItaim <br /> E=E Stop . . . . . <br /> El DORADO . . . . . . . . . . . . . . <br /> Date map was drawn03:27"I9 <br /> Instructions <br /> It you already have a diagram that shows al required information you may include n.rather than this page,wdb your Monitoring System Certification. On your site plan. <br /> show the genera!layout of tanks and piping. Cilearty identify locations of the following equipment,d installed.monitoring system cwtrol panels;sensors monitonng tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas mechanical or eliectronic line leak detectors:and m-tank liquid level <br /> probes(if used for leak de=.ect*ni. In the space provided.note the date this Site Plan,was prepared. <br /> Page 6 of 6 <br />