My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2026 7:53:47 PM
Creation date
2/21/2025 2:03:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231911
PE
2361 - UST FACILITY
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
14971 N STATE ROUTE 88 LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />7. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />p 3 GPH [--10.1 GPH ❑ 0.2 GPH <br />Yes <br />No <br />NA <br />Has the testing apparatus been properly calibrated? <br />0 <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />❑ <br />❑ <br />0 <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />0 <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />❑ <br />❑ <br />0 <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />❑ <br />❑ <br />0 <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a tightness test? <br />❑ <br />❑ <br />0 <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />❑ <br />❑ <br />0 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />0 <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements?✓❑ <br />❑ <br />101 <br />❑ <br />LLD ID <br />LLD Model <br />Lines Monitored <br />Pass <br />Fail <br />87 <br />FE PETRO <br />87 LINES <br />0 <br />❑ <br />91 <br />99LD 2000 <br />91 LINES <br />0 <br />❑ <br />DSL <br />99LD 2000 <br />DSL LINES <br />El <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Describe all answers marked "No" or "Fail" and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.