Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Cadwell Level Change Indicator <br /> Sump/UDC ID Diesel Tank Sump 91 Tank Sump <br /> Sump Manufacturer Cgl CSI <br /> Sump Depth (inches) 44 44 " <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 25" 24„ <br /> Test Start Time 0 mins 0 mins <br /> Initial Reading 26" 25" <br /> Test End Time 30 mins 30 mins <br /> Final Reading 26" 25" <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria Pass Pass <br /> Tightness Test Results C3 Pass ❑ Fail la Pass ❑ Fail ❑Pass ❑ Fail ❑ Pass ❑ Fail <br /> SumplUDC ID — <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass ail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked 'Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />