My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2026 11:38:15 AM
Creation date
2/24/2025 12:54:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231084
PE
2361 - UST FACILITY
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2320 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Cadwell Level Change Indicator <br /> Sump/UDC ID Diesel Tank Sump 91 Tank Sump <br /> Sump Manufacturer Cgl CSI <br /> Sump Depth (inches) 44 44 " <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 25" 24„ <br /> Test Start Time 0 mins 0 mins <br /> Initial Reading 26" 25" <br /> Test End Time 30 mins 30 mins <br /> Final Reading 26" 25" <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria Pass Pass <br /> Tightness Test Results C3 Pass ❑ Fail la Pass ❑ Fail ❑Pass ❑ Fail ❑ Pass ❑ Fail <br /> SumplUDC ID — <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass ail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked 'Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.