Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> L 10. MONITORING SITE PLAN <br /> Date site plan was prepared:3/1/2024 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan most show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> U ST Walter"Site Plan <br /> S Is Ady:=Y=__. PLAZA LIQOUR#i NO S 0J[L4LA1 ,992A0 <br /> OA <br /> F <br /> L <br /> a 1 <br /> l <br /> (f STORE <br /> _ ❑ X \ . <br /> A=4-N-v Ax Sensor <br /> =FIL LS <br /> V=VAPOR <br /> _ 4 <br /> P=PROBE <br /> L=Turbine'Leak Detector <br /> X=SUN EP SENSOR PjPLqG a <br /> B=Brine Senior (4RRC1l S) <br /> S=Smart Seatsor lkawnig ofpiping <br /> C=Flants&Chaim G .2 emit of wrap and <br /> E=E Stop <br /> Underground <br /> drafting in <br /> ear <br /> swculate bloc <br /> Any item underground that are not visible to d%e cestu[ing teclsaxian are a pis <br /> profes6oual opnucn only and are solely for ist&MMoaal purposes. rJrannrsg not to <br /> scale. <br /> Date!nay was drawn 316120 <br /> Instructions <br /> if you already have a diagram that shows a required information you may ir;ctude it.ratter than this page,with your Monitoring System Gertifx ation On your site plan, <br /> show the general layout of tanks and pi'virig- Clearly 4entiFp local a of the following equipment if installed,mon�g System omirol panels:sensors monitor aani, <br /> annular spaces.sumps,dispenser pans,spill containers.or other secondary containment areas.mechamal or elec4rome kite leak detectors:and in tank liquid teve <br /> probes(if used for ieak detection) In the sow*pmvvR-d,note the dam this Site Ptah was prepared. <br /> Page 6 of 6 <br />