My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:16:19 PM
Creation date
3/3/2025 11:18:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0547072
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN INC. #41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1233 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> Ll Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No 1A <br /> 0 3 GPH L 0.1 GPH LJ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? 0 D Ell <br /> For emergency generator tank systems, does the LLD create an audible and visual LA J 0 <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is Ll Lj Wi <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically strut off if any portion of the Ll L] <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected Ll Ll <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 Lj Ll <br /> Were all LLDs confirmed operational within regulatory requirements? 0 E-) Ell <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> T1 Vaporless LD-2000 RUL. PROD. LINE R) Li <br /> T2 Vaporless LD-2000 PUL. PROD. LINE 0 L) <br /> T3 Vaporless LD-2000 DSL PROD. LINE ® Li <br /> li Il <br /> Ll Ii <br /> ® li <br /> Ll D <br /> J Lj <br /> D Ij <br /> Ll Lj <br /> Li D <br /> Li Q <br /> Describe ail answers marked "'No"or "Fail"'and proposed remedy in Section 9. <br /> List afl monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.