My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:16:19 PM
Creation date
3/3/2025 11:18:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0547072
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN INC. #41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1233 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,gL Tnknlgy <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:7-ELEVEN 41342 41342 Date:5/28/2025 <br /> Address: 1233 E Dr.Martin Luther King Jr Blvd Name:Jesus Saldivar <br /> City/State:Stockton CA <br /> Technician Signature: 4. <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 2 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram G <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS G. f <br /> 5 Do all E-Stops shutdown power to ALL STP's r <br /> 6 Are ALL E-Stops clearly Labeled G <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled tt f <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. �+ f <br /> 9 All safety barricades and test equipment has been properly removed �+ <br /> 10 E-Stop was reset and all dispensing functions are normal C« <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2379669 <br />
The URL can be used to link to this page
Your browser does not support the video tag.