Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Paport Form <br /> S. SUMPIUDD TEST <br /> Test Method Developed by ❑✓ Manufacturer Z Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum Z Hydrostatic <br /> Test Equipment Used. Incon Sump Test System <br /> SumplUDC ID T1 87A-Turbine T2 87B -Turbine 91 -Turbine Vent Box- <br /> Sump Manufacturer <br /> Sump Depth (inches) 67" 67" 67" 32" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 28" 23" 23" 16" <br /> (inches) <br /> Test Start Time 07:43 AM 07:43 AM 08:07 AM 08:07 AM <br /> Initial Reading 1.4702 4.0057 3.9794 5.6696 <br /> Test: End Time 07:58 AM 07:58 AM 08:22 AM 08:22 AM <br /> Final Reading 1.4689 4.0049 3.9793 5.6694 <br /> Change in Reading -0.0013 -0.0008 -0.0001 -0.0002 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results Pass Pass Pass Pass <br /> SUrmplUD ID 1/2 - UDC 3/4 - UDC 5/6- UDC 7/8 - UDC <br /> Stamp Manufacturer Environ Environ Environ Environ <br /> Sump Depth (inches) 36" 36" 30" 30" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:16 AM 10:16 AM 09:20 AM 09:20 AM <br /> Initial Reading 5.2616 3.8836 4.2925 4.7923 <br /> Test End Time 10:31 AM 10:31 AM 09:36 AM 09:36 AM <br /> Final Reading 5.2620 3.8831 4.2905 4.7918 <br /> Change in Reading 0.0004 -0.0005 -0.0020 -0.0005 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results Pass Pass Pass Pass <br /> Additional copies of this page may be attached, <br /> Aff tests marked "Faff"and airy repairs rude beforae or during the tightness test mast be described in <br /> the COMMENTS section. <br /> Page 3 of 4 <br />