My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 12:45:40 PM
Creation date
3/4/2025 1:37:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505615
PE
2361 - UST FACILITY
FACILITY_ID
FA0006898
FACILITY_NAME
eFUEL, LLC. - French Camp
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
10842 S HARLAN RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> B. IN-TANK GAUGING TESTING ' <br /> im Check this box if tank gauging is used only for inventory control. - <br /> C) Check this box if NO tank gauging equipment is installed. lies No NA <br /> Do not com fete this section if either box is checked. <br /> All wiring has been- 'I) visually inspected for kinks, breaks and proper entry and ® p 0 <br /> termination' and tested for ground faults? <br /> Were all ire-tank gauging probes visually inspected for damage and residue buildup ❑ ER 0 <br /> to ensure that floats move free) , fu noti ona By tested, and confirmed operational <br /> Was accuracy of system's product level readings tested? ❑ 9 0 <br /> Was accuracy of syfstem's water level readings tested? Q IR ❑ <br /> Were all probes reinstalled properly? 9 El El <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fall <br /> — ❑ 1:j <br /> ❑ ❑ <br /> ❑ 0 <br /> 0 ❑ <br /> Q ❑ <br /> 9. COMMENTS <br /> Describe aN answers marked "No"or "Fail"and proposed remedy, <br /> List all monitoring equipment either replaced or repaired, <br /> 1 <br /> Page 5of <br />
The URL can be used to link to this page
Your browser does not support the video tag.