My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 9:09:52 PM
Creation date
3/6/2025 2:22:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0548639
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1243 W MARCH LN STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 17. LINE LEAK DETECTOR TESTING <br /> [I Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> F] 3 GPH M 0.1 GPH rj 0.2 GPH <br /> Has the testing apparatus been properly calibrated? M El ri <br /> For emergency generator tank systems, does the LLD create an audible and visual rl M <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a rl P7 r <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is 0 ri ri <br /> detected? I <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the El <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected Im rn <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 848480 87 M rl <br /> Q2 848480 91 r rr <br /> Q3 848480 DSL M ri <br /> 0 Im <br /> rl REI <br /> ri 0 <br /> ri ri <br /> ® r <br /> rn ri <br /> rn r] <br /> In <br /> ri In <br /> Describe all answers marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.