My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:09:31 PM
Creation date
3/10/2025 11:17:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0517272
PE
2361 - UST FACILITY
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15237 N Thornton RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer is Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 52 Hydrostatic <br /> Test Equipment Used: <br /> Sump1UDC ID T2 Fill T3 Fill T4 Fill T5 Fill <br /> Sump Manufacturer Unknown Unknown Unknown Unknown <br /> Sump Depth (inches) 65" 65" 66" 63" <br /> Sump Bottom to Top of 32" 32' 33" 35" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:31 pm 2:32pm 2:32pm 2:32pm <br /> Initial Reading 2.8454 4.6787 5.6133 4.3489 <br /> Test End Time 12:46pm 2:47pm 2:47pm 2:47pm <br /> Final Reading 2.8455 4.6782 5.6128 4.3482 <br /> Change in Reading -0.0001 0.0005 0.0005 0.0007 <br /> Pass/Fail Criteria +1- 0.002 +1-0.002 +1-+0.002 +1_ 0.002 <br /> Tightness Test Results 2 Pass ❑ Fail 62 Pass ❑ Fail 50 Pass ❑ Fail 62 Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> PasslFail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass 0 Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.